Difference between revisions of "Project File:Mapping Table – Optional"

From Gsshawiki
Jump to: navigation, search
(Created page with "When using the Mapping Table to assign any of the distributed parameters the Mapping Table card must be included. {| class="thin" |- ! Card !! Argument !! Description |- | <...")
 
(No difference)

Latest revision as of 21:16, 11 July 2013

When using the Mapping Table to assign any of the distributed parameters the Mapping Table card must be included.

Card Argument Description
MAPPING_TABLE  "filename.cmt"
filename Input ASCII file that assigns grid-based parameter values based on grid index maps.
ST_MAPPING_TABLE  "filename.smt"
filename Input ASCII file that assigns link/node parameter values based on stream index maps.


GSSHA User's Manual

3 Project File
3.1     Required Inputs
3.2     Mapping Table – Optional
3.3     Overland Flow – Required
3.4     Interception – Optional
3.5     Rainfall Input and Options – Required
3.6     Infiltration – Optional
3.7     Channel Routing – Optional
3.8     Continuous Simulations – Optional
3.9     Saturated Groundwater Flow – Optional
3.10     Soil Erosion – Optional
3.11     Constituent Transport – Optional
3.12     Subsurface Drainage Network – Optional
3.13     Output Files – Required