Difference between revisions of "Building a Model:Sediment Transport"
From Gsshawiki
(No difference)
|
Latest revision as of 17:54, 20 May 2008
Once a working hydrology/hydraulics model has been calibrated and verified, sediment transport can be added to the model. Overland sediment transport parameters are derived from the soil-texture/land-use index maps. Users should consult the manual and sediment transport textbooks (such as Yang, 1996) to learn about using Yang’s method (Yang, 1973) to assign appropriate parameters for the in-stream sediment routing. As with the hydrology/hydraulics portion of the code, the sediment model should also be calibrated and verified to observed data.
GSSHA User's Manual
- 16 Building a Model
- 16.1 Delineating the Watershed
- 16.2 Selecting a Grid Size
- 16.3 Overland Flow Routing
- 16.4 Infiltration
- 16.5 Channel Routing
- 16.6 Single Event Calibration
- 16.7 Long-term Simulations
- 16.8 Saturated Groundwater Modeling
- 16.9 Calibration and Verification
- 16.10 Sediment Transport
- 16.11 Contaminant Transport